Written by
Bureau Report
The six roads identified for the project are Surya hospital to Thakar Vasti (3.74 km), Surya hospital to Sakhare Vasti in Hinjewadi phase 1 (1.30 km), Marunji to Shani Mandir (3.5 km), Nande to Maan (1.8 km), Marunji to Shani Mandir in Wakad (3.5 km), and Thakar Vasti to Maan (3 km).










